Supply of structural steel to Dahisar projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Dahisar is the toll naka, the check naka, Dahisar East's Anand Nagar and the west-side societies towards Kandarpada and the creek, with the Metro now running down to Andheri.
SRA schemes here use PEB for site offices and labour camps, plus steel for transfer structures where rehab and sale wings share a podium.
Society redevelopment of 12 to 20 floors, new mid-rise projects on the east near the highway and along the Metro corridor.
Trailer-load delivery of long-span girders and PEB frames straight from our fabrication shop; mobile cranes erect on site.
Families from Borivali and Dahisar, and first-time buyers who want the city limits with Metro access. That is who our inventory desk sells to when we take units here, which is why material-only barter in Dahisar is typically 12–20% below the developer's rate rather than deeper.
Bundled with contracting in Dahisar, the flats are taken at 35% below market and one work order covers structure and material.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply structural steel to projects in Dahisar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
For material-only supply in Dahisar the barter rate is usually 12–20% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
5 MT minimum; project supply 100 to 3,000 MT Smaller requirements can be clubbed with a neighbouring site in Dahisar if the timing works.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Other services in Dahisar:
Send the BOQ and the units you can allot. Proposal in 48 hours.