Barter contracting · Mumbai

Barter contractor in Mumbai

Excavation, piling, RCC and civil work — quoted from your drawings, executed by our own teams and machinery, settled in flats of the same project at 35% below market. Or 50% barter + 50% payment. Or 100% payment.

Home / Barter contracting Mumbai
Mumbai · Navi Mumbai · Thane · MMR

Contracting that pays itself in flats

We take the whole structure — excavation, shoring, piling, RCC and civil — on a work order that is settled in flats of the same project instead of cash. Flats are valued at 35% below the project's current market rate; the work-order value divided by that rate is the carpet area we receive, released as your PMC certifies each milestone.

The quote is prepared from your drawings and elevation, separately for conventional RCC casting, Mivan (aluminium formwork) or traditional construction. Developers who want to keep inventory can take the same work at 50% barter + 50% payment, or as a plain cash contract on RA bills.

From single-building society redevelopment in Girgaon to 40-storey Mivan towers in Kharghar, the same team, the same documentation, the same 35%.

Mumbai
Structure in progress · Mumbai
Scope of work

Excavation to civil, in sequence

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Quoting basis

Quoted from drawings, by technology

We quote per sq ft built-up or item-rate BOQ from your architectural and structural drawings and elevation. The technology follows the structure; we show all three so you can compare.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Settlement

Three ways to pay for the work

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Run the numbers for Mumbai

Enter the work-order value and the rate at which flats sell in the project. Typical society redevelopment and SRA schemes rates in Mumbai are pre-filled; change them freely.

Flats received are sold through our inventory desk; we carry the selling risk.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Process

From drawings to registered flats

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Barter contracting in Mumbai: questions

Do you take contracting work in Mumbai against flats?

Yes. Barter Constructions executes excavation, piling, RCC and civil work for projects in Mumbai against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. We also take 50% barter + 50% payment and 100% payment contracts.

How do you quote a project in Mumbai?

From your architectural and structural drawings, elevation and floor plates. We take off quantities and quote per sq ft built-up or item-rate BOQ, separately for conventional RCC casting, Mivan (aluminium formwork) or traditional load-bearing construction as the structure demands.

What does 35% below market mean for a project in Mumbai?

If flats in your Mumbai project sell at ₹22,000/sq ft carpet today, we value the flats we receive at about ₹14,300/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.

Which construction technology do you use in Mumbai?

For society redevelopment and SRA schemes in Mumbai we recommend the technology the structure demands: conventional RCC for irregular plots and podium-tower layouts, Mivan for repetitive floor plates above 20 floors, traditional load-bearing for low-rise. All three are quoted side by side.

Can we do 50% barter and 50% payment in Mumbai?

Yes, this is our most common structure for redevelopment schemes. The barter half is settled in flats at the agreed barter rate; the payment half is billed as running-account bills against PMC certification.

Is the Mumbai barter contract RERA-compliant?

Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.

How fast can you mobilise in Mumbai?

Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.

Do you also supply materials on barter in Mumbai?

Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Mumbai, either bundled into the contracting work order or as a separate supply agreement.

Locality pages

Barter contractor by area

Western, Central and Harbour lines, Navi Mumbai, Thane and the Vasai-Virar belt. Each page carries local project context, technology recommendation, barter discount and FAQs.

Searches this page answers
barter contractor mumbaicontractor against flats mumbaiconstruction contractor on barter mumbairedevelopment contractor mumbaircc contractor mumbaimivan contractor mumbaicivil contractor mumbaipiling contractor mumbaiexcavation contractor mumbaiturnkey contractor mumbaibuilding contractor mumbailabour contractor mumbaiconstruction company mumbaibarter contractor navi mumbaicontractor against flats navi mumbaiconstruction contractor on barter navi mumbairedevelopment contractor navi mumbaibarter contractor thanecontractor against flats thaneconstruction contractor on barter thaneredevelopment contractor thaneconstruction against flats mumbaimivan construction mumbairedevelopment contractor mumbai

Building in Mumbai? Pay in flats.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞