ISMB, ISMC, angles, MS plates, hollow sections, PEB and fabricated steel structures from Steel Mills and Suppliers Stocks' own fabrication set-up, settled against units. Serving Navi Mumbai and the rest of Navi Mumbai.
Navi Mumbai is CIDCO's planned city: Vashi to Belapur on the Harbour line, Kharghar to Panvel on the Panvel line, Airoli to Ghansoli on the Trans-Harbour line, and Ulwe and Taloja at the airport end.
Affordable projects here use steel mainly for parking sheds, staircases and compound gates; PEB warehouses are the larger orders in this belt.
Every node has its own profile: CIDCO-building redevelopment in Vashi and Nerul, high-rise townships in Kharghar and Seawoods, affordable launches in Ulwe and Taloja.
Trailer-load delivery of long-span girders and PEB frames straight from our fabrication shop; mobile cranes erect on site.
IT and corporate professionals from Belapur and Airoli, families from Mumbai's eastern suburbs, and investors buying on the airport and MTHL. That is who our inventory desk sells to when we take units here, which is why material-only barter in Navi Mumbai is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Navi Mumbai, the flats are taken at 35% below market and one work order covers structure and material.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply structural steel to projects in Navi Mumbai and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
5 MT minimum; project supply 100 to 3,000 MT Smaller requirements can be clubbed with a neighbouring site in Navi Mumbai if the timing works.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 5 MT minimum; project supply 100 to 3,000 MT
SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Other services in Navi Mumbai:
Send the BOQ and the units you can allot. Proposal in 48 hours.