ISMB, ISMC, angles, MS plates, hollow sections, PEB and fabricated steel structures from Steel Mills and Suppliers Stocks' own fabrication set-up, settled against units. Serving Altamount Road and the rest of South Mumbai.
Altamount Road and Carmichael Road form the most expensive kilometre in the country, where 1970s society buildings sit next to private residences and each redevelopment is a landmark in its own right.
Ultra-luxury redevelopment into 20 to 40-storey towers with full-floor 5 BHK apartments, private lobbies and multi-level basements.
Luxury towers here use fabricated steel for sky lounges, canopies, feature staircases and podium structures.
Short fabricated members lifted by tower crane from the road; we design splices to suit the crane's reach and capacity.
Industrialist families and top-tier professionals; each flat is negotiated individually and rarely advertised. That is who our inventory desk sells to when we take units here, which is why material-only barter in Altamount Road is typically 8–15% below the developer's rate rather than deeper.
Used heavily for podium steel, MEP supports, PEB parking and club-house structures; settled against commercial or residential units. Combine it with barter contracting in Altamount Road for a single settlement at 35% below market.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply structural steel to projects in Altamount Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
5 MT minimum; project supply 100 to 3,000 MT Smaller requirements can be clubbed with a neighbouring site in Altamount Road if the timing works.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 5 MT minimum; project supply 100 to 3,000 MT
Other services in Altamount Road:
Send the BOQ and the units you can allot. Proposal in 48 hours.