ISMB, ISMC, angles, MS plates, hollow sections, PEB and fabricated steel structures from Steel Mills and Suppliers Stocks' own fabrication set-up, settled against units. Serving Charni Road and the rest of South Mumbai.
Charni Road runs from Girgaum Chowpatty past Prarthana Samaj and Saifee Hospital to Opera House, a corridor of MHADA cessed buildings and old societies with sea breeze on one side and Girgaum lanes on the other.
Redevelopment buildings here use structural steel for staircases, canopies, railings and the occasional transfer beam.
MHADA-cessed redevelopment yields 12 to 20-storey buildings with rehab floors below and sale flats above, occasionally with a Chowpatty view that changes the sale price entirely.
Members up to 9 m on 10-wheelers at night, crane-erected; larger girders are fabricated in two pieces and bolted.
Sale flats go to families from Girgaon and Malabar Hill looking for a smaller, newer flat near the sea. That is who our inventory desk sells to when we take units here, which is why material-only barter in Charni Road is typically 10–18% below the developer's rate rather than deeper.
Used heavily for podium steel, MEP supports, PEB parking and club-house structures; settled against commercial or residential units. Combine it with barter contracting in Charni Road for a single settlement at 35% below market.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply structural steel to projects in Charni Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 5 MT minimum; project supply 100 to 3,000 MT
Mill TC, fabrication drawings, GST invoice. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Yes. Most developers bundle structural steel with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Members up to 9 m on 10-wheelers at night, crane-erected; larger girders are fabricated in two pieces and bolted.
Other services in Charni Road:
Send the BOQ and the units you can allot. Proposal in 48 hours.