Supply of structural steel to Dadar projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Dadar is the city's crossroads: Shivaji Park, Hindu Colony, Parsi Colony, the flower market and the Kabutar Khana, with thousands of 1940s to 70s societies on both sides of the station.
Society redevelopment produces 15 to 25-storey buildings with 2 and 3 BHKs; Shivaji Park-facing plots command a premium and Hindu Colony has strict height and heritage rules.
Members up to 9 m on 10-wheelers at night, crane-erected; larger girders are fabricated in two pieces and bolted.
Redevelopment buildings here use structural steel for staircases, canopies, railings and the occasional transfer beam.
Maharashtrian and Gujarati families who already live in Dadar and will not move out; every launch sells locally. That is who our inventory desk sells to when we take units here, which is why material-only barter in Dadar is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Dadar, the flats are taken at 35% below market and one work order covers structure and material.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply structural steel to projects in Dadar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
For material-only supply in Dadar the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Yes. Most developers bundle structural steel with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Members up to 9 m on 10-wheelers at night, crane-erected; larger girders are fabricated in two pieces and bolted.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Dadar:
Send the BOQ and the units you can allot. Proposal in 48 hours.