Barter contracting · Kharghar

Barter contractor in Kharghar

Excavation, piling, RCC and civil work for projects in Kharghar, quoted from your drawings and settled in flats of the same project at 35% below market. Or 50/50. Or cash.

Home / Barter contracting Mumbai / Kharghar
Kharghar · Navi Mumbai · Navi Mumbai

Kharghar: the ground reality

Kharghar is the golf course, Central Park, the hills, Sector 35 and the belt of high-rise townships that made it Navi Mumbai's fastest-growing node.

High-rise townships of 25 to 45 floors with 1, 2 and 3 BHKs, clubhouses and podiums; Mivan construction throughout.

Access shapes the programme. Sion–Panvel Highway and sector roads take trailers; large regular plots.

IT and corporate professionals from Belapur and Airoli, families from Mumbai's eastern suburbs, and investors buying on the airport. Kharghar launches sell steadily on the airport and Metro; we settle in launch-phase flats and reset at each phase.

Plots in Kharghar are regular and floor plates repeat, so Mivan (aluminium formwork) is the first quote: monolithic walls and slabs on a 7-day cycle, formwork sets we own, and a lower per-sq-ft rate once the tower crosses 20 floors. We quote conventional RCC alongside for the podium and any irregular wing.

For Kharghar developers: a contractor who does not need monthly RA payments. We take flats at 35% below market, half-barter, or cash, whichever suits the project's cash flow this year.

Kharghar
Kharghar · highway access for trailer-load deliveries
Scope of work

Scope: demolition to plaster

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Settlement

Three ways to pay for the work

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Quoting basis

How we quote in Kharghar

Plots in Kharghar are regular and floor plates repeat, so Mivan (aluminium formwork) is the first quote: monolithic walls and slabs on a 7-day cycle, formwork sets we own, and a lower per-sq-ft rate once the tower crosses 20 floors. We quote conventional RCC alongside for the podium and any irregular wing.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Process

Step by step

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

Before you call: Kharghar FAQs

Do you take contracting work in Kharghar against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Kharghar against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

How quickly can you mobilise in Kharghar?

Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.

Do you supply materials on barter in Kharghar as well?

Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Kharghar, bundled into the contracting work order or as a separate supply agreement.

What does 35% below market mean in practice for Kharghar?

If flats in your Kharghar project are selling at ₹20,000/sq ft carpet, we value the flats we receive at about ₹13,000/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.

Is a barter contract in Kharghar RERA-compliant?

Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.

Who sells the flats you receive in Kharghar?

We do, through our inventory desk, or we hold them. The developer's sales team is not involved and there is no conflict with their pricing; our units are sold at a market-linked rate, not undercut.

Can the society or the PMC vet Barter Constructions before the Kharghar development agreement is signed?

Yes, and we encourage it. We share our execution record, machinery list, formwork inventory and references, and attend society meetings with the developer when asked.

Why we hold flats here

Demand in Kharghar

Township launches in this belt sell on amenities and connectivity; healthy launch-phase absorption means flats allotted to us are typically sold before the structure is complete.

IT and corporate professionals from Belapur and Airoli, families from Mumbai's eastern suburbs, and investors buying on the airport. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Neighbouring areas

Material supply on barter in Kharghar:

Searches this page answers
redevelopment contractor khargharconstruction company khargharmivan contractor khargharpiling contractor khargharturnkey contractor khargharexcavation contractor khargharconstruction contractor on barter khargharrcc contractor khargharcontractor against flats khargharbarter contractor navi mumbaicontractor against flats navi mumbaiconstruction contractor on barter navi mumbaiconstruction against flats khargharcontractor for redevelopment khargharmivan construction kharghar

Kharghar structure, settled in units.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞