ISMB, ISMC, angles, MS plates, hollow sections, PEB and fabricated steel structures from Steel Mills and Suppliers Stocks' own fabrication set-up, settled against units. Serving Mumbai Central and the rest of South Mumbai.
Mumbai Central is the station, the ST depot, Bellasis Road and Nagpada's dense mix of BIT chawls, Muslim trading families and cessed buildings, with the Mumbai Central–Byculla belt now in cluster-redevelopment plans.
SRA schemes here use PEB for site offices and labour camps, plus steel for transfer structures where rehab and sale wings share a podium.
BIT chawl and cluster redevelopment produce 20 to 30-storey buildings with rehab wings and sale wings, often with large retail plinths facing the main road.
Members up to 9 m on 10-wheelers at night, crane-erected; larger girders are fabricated in two pieces and bolted.
Rehab tenants stay; sale flats go to trading families from Nagpada and Byculla who want to remain in the community. That is who our inventory desk sells to when we take units here, which is why material-only barter in Mumbai Central is typically 12–20% below the developer's rate rather than deeper.
Used heavily for podium steel, MEP supports, PEB parking and club-house structures; settled against commercial or residential units. Combine it with barter contracting in Mumbai Central for a single settlement at 35% below market.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Sections | ISMB, ISMC, ISA, MS plates 5–50 mm, RHS/SHS, chequered plates, GI/HR coils |
|---|---|
| Fabrication | Cut, drill, weld, primer; PEB sheds, staircases, grills, railings, sky-walks |
| Brands | SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock |
| Lot size | 5 MT minimum; project supply 100 to 3,000 MT |
| Pricing basis | Per kg delivered, fabrication per kg or per item |
| Documents | Mill TC, fabrication drawings, GST invoice |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply structural steel to projects in Mumbai Central and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 5 MT minimum; project supply 100 to 3,000 MT
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
SAIL, JSW, Jindal, Tata Structura, APL Apollo, Steel Mills and Suppliers Stocks alloy stock. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Other services in Mumbai Central:
Send the BOQ and the units you can allot. Proposal in 48 hours.