Supply of tmt bars to Koparkhairane projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Redevelopment plots here use Fe500D throughout, with heavier bars in the transfer level where tenants' floors sit below the sale floors.
Koparkhairane is the Sector 1 to 28 grid, the station, Thane–Belapur Road and a stock of 1990s CIDCO buildings that are now under redevelopment.
CIDCO-society redevelopment of 10 to 20 floors with 2 and 3 BHKs; regular plots.
Full 12 m bundles arrive on trailers, unloaded by site crane into a proper steel yard; cut-and-bend can be done on site or at our yard, whichever the PMC prefers.
Families from Koparkhairane and Vashi who have lived in CIDCO buildings for years. That is who our inventory desk sells to when we take units here, which is why material-only barter in Koparkhairane is typically 10–18% below the developer's rate rather than deeper.
Typical structure: TMT for 3 to 6 towers of a redevelopment scheme is settled against 1 to 4 residential units at the project's agreed barter rate. Combine it with barter contracting in Koparkhairane for a single settlement at 35% below market.
| Grades | Fe500, Fe500D, Fe550D, Fe600 (IS 1786:2008) |
|---|---|
| Sizes | 8, 10, 12, 16, 20, 25, 32 mm; cut-and-bend and CNC pile-cage fabrication available |
| Brands | JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request |
| Lot size | 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ |
| Pricing basis | Daily Mumbai market rate + ex-yard freight, locked per delivery or per month as agreed |
| Documents | Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply tmt bars to projects in Koparkhairane and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
For material-only supply in Koparkhairane the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ Smaller requirements can be clubbed with a neighbouring site in Koparkhairane if the timing works.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Full 12 m bundles arrive on trailers, unloaded by site crane into a proper steel yard; cut-and-bend can be done on site or at our yard, whichever the PMC prefers.
Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Other services in Koparkhairane:
Send the BOQ and the units you can allot. Proposal in 48 hours.