Fe500 / Fe500D / Fe550D TMT from primary mills (JSW, Tata Tiscon, SAIL, Jindal Panther, Vizag) delivered to site and settled in flats, shops or units — not cash. Serving Vile Parle and the rest of Western Suburbs.
Vile Parle is the Gujarati heartland of the western suburbs: Hanuman Road, Irla, Nehru Road, the Parle Tilak schools and hundreds of 1960s to 80s societies on both sides of the station.
Redevelopment plots here use Fe500D throughout, with heavier bars in the transfer level where tenants' floors sit below the sale floors.
Society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs; airport height limits cap some plots on the east.
TMT comes in on 6- and 10-wheelers at night, 12 m lengths where the road allows and cut-and-bend from our yard where it does not. Deliveries are timed to the bar-bending schedule so nothing sits on the road.
Gujarati families from the same societies and neighbouring Parle lanes; almost every launch sells to locals. That is who our inventory desk sells to when we take units here, which is why material-only barter in Vile Parle is typically 10–18% below the developer's rate rather than deeper.
Typical structure: TMT for 3 to 6 towers of a redevelopment scheme is settled against 1 to 4 residential units at the project's agreed barter rate. Combine it with barter contracting in Vile Parle for a single settlement at 35% below market.
| Grades | Fe500, Fe500D, Fe550D, Fe600 (IS 1786:2008) |
|---|---|
| Sizes | 8, 10, 12, 16, 20, 25, 32 mm; cut-and-bend and CNC pile-cage fabrication available |
| Brands | JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request |
| Lot size | 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ |
| Pricing basis | Daily Mumbai market rate + ex-yard freight, locked per delivery or per month as agreed |
| Documents | Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply tmt bars to projects in Vile Parle and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
TMT comes in on 6- and 10-wheelers at night, 12 m lengths where the road allows and cut-and-bend from our yard where it does not. Deliveries are timed to the bar-bending schedule so nothing sits on the road.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+
Yes. Most developers bundle tmt bars with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Other services in Vile Parle:
Send the BOQ and the units you can allot. Proposal in 48 hours.