TMT supplier on barter for Kalbadevi sites: fe500 / Fe500D / Fe550D TMT from primary mills (JSW, Tata Tiscon, SAIL, Jindal Panther, Vizag) delivered to site and settled in flats, shops or units — not cash.
Redevelopment plots here use Fe500D throughout, with heavier bars in the transfer level where tenants' floors sit below the sale floors.
Kalbadevi is the textile and hardware market district, Mumbadevi Temple, Zaveri Bazaar on one side and Crawford Market on the other, with hundreds of cessed buildings that have been on the cluster-redevelopment list for years.
Cluster redevelopment under 33(9) is the only viable route: entire blocks of tenanted buildings replaced by towers with shops, godowns and rehab flats plus a sale component.
For TMT this means bundles cut to 6 m or shorter so they turn into the lane, unloading by hand or mini-crane after 11 pm, and steel stacked inside the plinth rather than in a yard. We also do cut-and-bend at our yard so the site only receives finished bars.
Traders who own shops here buy the sale flats above to stay close to their businesses; commercial units are the real prize. That is who our inventory desk sells to when we take units here, which is why material-only barter in Kalbadevi is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Kalbadevi, the flats are taken at 35% below market and one work order covers structure and material.
| Grades | Fe500, Fe500D, Fe550D, Fe600 (IS 1786:2008) |
|---|---|
| Sizes | 8, 10, 12, 16, 20, 25, 32 mm; cut-and-bend and CNC pile-cage fabrication available |
| Brands | JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request |
| Lot size | 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ |
| Pricing basis | Daily Mumbai market rate + ex-yard freight, locked per delivery or per month as agreed |
| Documents | Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply tmt bars to projects in Kalbadevi and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
For material-only supply in Kalbadevi the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
For TMT this means bundles cut to 6 m or shorter so they turn into the lane, unloading by hand or mini-crane after 11 pm, and steel stacked inside the plinth rather than in a yard. We also do cut-and-bend at our yard so the site only receives finished bars.
20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ Smaller requirements can be clubbed with a neighbouring site in Kalbadevi if the timing works.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Other services in Kalbadevi:
Send the BOQ and the units you can allot. Proposal in 48 hours.