Fe500 / Fe500D / Fe550D TMT from primary mills (JSW, Tata Tiscon, SAIL, Jindal Panther, Vizag) delivered to site and settled in flats, shops or units — not cash. Serving Mira Road and the rest of Mira-Bhayandar.
Mira Road is the first suburb beyond the Dahisar check naka: Shanti Park, Sector 5 to 11, Kanakia Road, Beverly Park and the Mira–Bhayandar Road belt, with the Metro extension now reaching it.
Mid-rise and township projects of 15 to 30 floors with 1 and 2 BHKs in volume, plus society redevelopment of 7 to 12-storey buildings from the 1990s.
Affordable projects here are cost-driven, so we offer primary-mill Fe500D where the consultant insists and approved secondary-mill bars where the spec allows.
Highway access means trailer-load deliveries of 12 m bundles direct from the mill or our yard, unloaded by crane into a steel yard on site; the largest single deliveries we make in the city are on this belt.
Gujarati, Marathi and Muslim families from Borivali and Dahisar, and first-time buyers from across the western suburbs. That is who our inventory desk sells to when we take units here, which is why material-only barter in Mira Road is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Mira Road, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | Fe500, Fe500D, Fe550D, Fe600 (IS 1786:2008) |
|---|---|
| Sizes | 8, 10, 12, 16, 20, 25, 32 mm; cut-and-bend and CNC pile-cage fabrication available |
| Brands | JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request |
| Lot size | 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ |
| Pricing basis | Daily Mumbai market rate + ex-yard freight, locked per delivery or per month as agreed |
| Documents | Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply tmt bars to projects in Mira Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Highway access means trailer-load deliveries of 12 m bundles direct from the mill or our yard, unloaded by crane into a steel yard on site; the largest single deliveries we make in the city are on this belt.
20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ Smaller requirements can be clubbed with a neighbouring site in Mira Road if the timing works.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+
Yes. Most developers bundle tmt bars with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Other services in Mira Road:
Send the BOQ and the units you can allot. Proposal in 48 hours.