TMT supplier on barter for Juhu sites: fe500 / Fe500D / Fe550D TMT from primary mills (JSW, Tata Tiscon, SAIL, Jindal Panther, Vizag) delivered to site and settled in flats, shops or units — not cash.
Juhu is the beach, Juhu Tara Road, JVPD Scheme, Gulmohar Road and the film-industry bungalows and 1970s societies that are slowly turning into sea-facing towers.
Luxury towers here specify Fe550D and often CRS bars, with pile cages and shear-wall reinforcement making up a large share of the tonnage.
Luxury redevelopment of 12 to 25 floors with 3 and 4 BHKs; beach-facing plots are CRZ-controlled, JVPD has plot-size rules that keep buildings low.
Sea-facing sites get corrosion-resistant CRS or epoxy-coated bars where the structural consultant specifies them, delivered at night in 6-wheeler loads and stored under cover to avoid chloride exposure before casting.
Film and media families, business owners from Vile Parle and Andheri moving up to a sea-facing address. That is who our inventory desk sells to when we take units here, which is why material-only barter in Juhu is typically 8–15% below the developer's rate rather than deeper.
Typical structure: TMT for 3 to 6 towers of a redevelopment scheme is settled against 1 to 4 residential units at the project's agreed barter rate. Combine it with barter contracting in Juhu for a single settlement at 35% below market.
| Grades | Fe500, Fe500D, Fe550D, Fe600 (IS 1786:2008) |
|---|---|
| Sizes | 8, 10, 12, 16, 20, 25, 32 mm; cut-and-bend and CNC pile-cage fabrication available |
| Brands | JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request |
| Lot size | 20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ |
| Pricing basis | Daily Mumbai market rate + ex-yard freight, locked per delivery or per month as agreed |
| Documents | Mill test certificate, weighbridge slip, e-way bill, GST invoice on every truck |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply tmt bars to projects in Juhu and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Yes. Most developers bundle tmt bars with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
20 MT minimum per delivery; project supply 300 MT to 5,000 MT+ Smaller requirements can be clubbed with a neighbouring site in Juhu if the timing works.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
JSW Neosteel, Tata Tiscon, SAIL, Jindal Panther, Vizag, Kamdhenu, secondary mills on request. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Other services in Juhu:
Send the BOQ and the units you can allot. Proposal in 48 hours.