M20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units. Serving Vile Parle and the rest of Western Suburbs.
Vile Parle is the Gujarati heartland of the western suburbs: Hanuman Road, Irla, Nehru Road, the Parle Tilak schools and hundreds of 1960s to 80s societies on both sides of the station.
Society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs; airport height limits cap some plots on the east.
Redevelopment plots here pour small slabs of 150 to 300 cu m, so we plan night pours with two or three mixers cycling from the nearest plant.
Standard transit mixers work at night with a boom pump on the main road or a stationary pump for the inner sites; slab pours are scheduled in one continuous night window.
Gujarati families from the same societies and neighbouring Parle lanes; almost every launch sells to locals. That is who our inventory desk sells to when we take units here, which is why material-only barter in Vile Parle is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Vile Parle, the flats are taken at 35% below market and one work order covers structure and material.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Yes. We supply ready-mix concrete to projects in Vile Parle and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
For material-only supply in Vile Parle the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Vile Parle:
Send the BOQ and the units you can allot. Proposal in 48 hours.