AAC block supplier on barter for Dadar sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Dadar is the city's crossroads: Shivaji Park, Hindu Colony, Parsi Colony, the flower market and the Kabutar Khana, with thousands of 1940s to 70s societies on both sides of the station.
Society redevelopment produces 15 to 25-storey buildings with 2 and 3 BHKs; Shivaji Park-facing plots command a premium and Hindu Colony has strict height and heritage rules.
Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Maharashtrian and Gujarati families who already live in Dadar and will not move out; every launch sells locally. That is who our inventory desk sells to when we take units here, which is why material-only barter in Dadar is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Dadar, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply aac blocks & bricks to projects in Dadar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Dadar if the timing works.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Other services in Dadar:
Send the BOQ and the units you can allot. Proposal in 48 hours.