What Juhu sites are like

Juhu is the beach, Juhu Tara Road, JVPD Scheme, Gulmohar Road and the film-industry bungalows and 1970s societies that are slowly turning into sea-facing towers.

Film and media families, business owners from Vile Parle and Andheri moving up to a sea-facing address. CRZ delays and low FSI make Juhu projects small in count but high in value; a single sea-facing flat settles the structure package.

Luxury redevelopment of 12 to 25 floors with 3 and 4 BHKs; beach-facing plots are CRZ-controlled, JVPD has plot-size rules that keep buildings low.

Access shapes the programme. Juhu Tara Road is congested; sea-side sites need CRZ clearance and corrosion-grade materials. Night deliveries, cranes on site.

Towers in Juhu are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

For Juhu developers: a contractor who does not need monthly RA payments. We take flats at 35% below market, half-barter, or cash, whichever suits the project's cash flow this year.

Juhu
Juhu · CRZ rules and marine exposure
Settlement

How the work order is settled

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Scope of work

The work, stage by stage

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Quoting basis

Pricing follows the structure

Towers in Juhu are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

FAQ

Before you call: Juhu FAQs

Do you take contracting work in Juhu against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Juhu against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

Can the Juhu contract be 50% barter and 50% payment?

Yes, and it is our most common structure for redevelopment schemes. The barter half is settled in flats at the agreed barter rate; the payment half is billed as running-account bills against PMC certification.

How quickly can you mobilise in Juhu?

Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.

Is a barter contract in Juhu RERA-compliant?

Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.

Do you supply materials on barter in Juhu as well?

Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Juhu, bundled into the contracting work order or as a separate supply agreement.

Which floors and flats do you take in Juhu?

A mix agreed at signing, usually mid-floor units of the most saleable configuration in the project rather than the best or worst floors. The unit schedule is part of the barter MOU, and we can swap units by mutual consent before registration.

Who sells the flats you receive in Juhu?

We do, through our inventory desk, or we hold them. The developer's sales team is not involved and there is no conflict with their pricing; our units are sold at a market-linked rate, not undercut.

Process

How a deal runs

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

Why we hold flats here

Selling what we receive in Juhu

Premium and ultra-luxury inventory in this belt has seen sustained absorption from end users and HNIs, so flats received on barter here are among the most liquid in our portfolio.

Film and media families, business owners from Vile Parle and Andheri moving up to a sea-facing address. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Other areas we cover

Material supply on barter in Juhu:

Searches this page answers
labour contractor juhumivan contractor juhucivil contractor juhuconstruction company juhubuilding contractor juhucontractor against flats juhuconstruction contractor on barter juhupiling contractor juhuredevelopment contractor juhubarter contractor western suburbscontractor against flats western suburbsconstruction contractor on barter western suburbsconstruction against flats juhucontractor for redevelopment juhurcc construction juhu

Building in Juhu? Pay in flats.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞