Supply of ready-mix concrete to Juhu projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Juhu is the beach, Juhu Tara Road, JVPD Scheme, Gulmohar Road and the film-industry bungalows and 1970s societies that are slowly turning into sea-facing towers.
Luxury towers here specify M50 to M60 for cores and columns, self-compacting mixes for congested reinforcement, and pumped placement above 40 floors.
Luxury redevelopment of 12 to 25 floors with 3 and 4 BHKs; beach-facing plots are CRZ-controlled, JVPD has plot-size rules that keep buildings low.
Marine exposure calls for M40 and above with low water-cement ratio, mineral admixtures and cover as per the durability spec; mixers come at night and pours are planned around tide-driven access restrictions where the site is on the sea wall.
Film and media families, business owners from Vile Parle and Andheri moving up to a sea-facing address. That is who our inventory desk sells to when we take units here, which is why material-only barter in Juhu is typically 8–15% below the developer's rate rather than deeper.
Bundled with contracting in Juhu, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply ready-mix concrete to projects in Juhu and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Other services in Juhu:
Send the BOQ and the units you can allot. Proposal in 48 hours.