AAC block supplier on barter · Charni Road

AAC Blocks & Bricks on barter in Charni Road

AAC block supplier on barter for Charni Road sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.

Home / Services / AAC Blocks & Bricks Mumbai / Charni Road
Charni Road · South Mumbai · Western line

Charni Road: aac blocks & bricks on barter

Charni Road runs from Girgaum Chowpatty past Prarthana Samaj and Saifee Hospital to Opera House, a corridor of MHADA cessed buildings and old societies with sea breeze on one side and Girgaum lanes on the other.

Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.

MHADA-cessed redevelopment yields 12 to 20-storey buildings with rehab floors below and sale flats above, occasionally with a Chowpatty view that changes the sale price entirely.

Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.

Sale flats go to families from Girgaon and Malabar Hill looking for a smaller, newer flat near the sea. That is who our inventory desk sells to when we take units here, which is why material-only barter in Charni Road is typically 10–18% below the developer's rate rather than deeper.

Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Charni Road for a single settlement at 35% below market.

AAC
AAC Blocks & Bricks · Charni Road · workable roads with night delivery windows
Specification

What we deliver

ProductsAAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster
BrandsSiporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants
Lot size1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks
DeliveryPallet delivery with crane unloading; floor-wise scheduling
Pricing basisPer cu m or per block, brand-wise
DocumentsIS 2185 test report, GST invoice, e-way bill
Process

Step by step

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

FAQ for Charni Road developers

Do you supply aac blocks & bricks in Charni Road on barter against flats?

Yes. We supply aac blocks & bricks to projects in Charni Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Is the Charni Road barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

Is there a minimum order for Charni Road?

Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Charni Road if the timing works.

Who bears the risk of the units you receive in Charni Road?

We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.

Which brands of aac blocks & bricks do you deliver to Charni Road?

1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.

What barter rate applies to a material-only deal in Charni Road?

For material-only supply in Charni Road the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.

Settlement

Barter, half-barter or cash

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Also serving

Neighbouring areas

Other services in Charni Road:

Searches this page answers
fly ash bricks supplier charni roadblock adhesive supplier charni roadaac blocks on barter charni roadaac blocks supplier charni roadaac blocks price charni roadaac block dealer charni roadsiporex dealer charni roadaac blocks supplier south mumbaiaac block dealer south mumbaisiporex dealer south mumbaiaac blocks & bricks against flats charni roadbarter construction charni roadconstruction material supplier charni road

AAC Blocks & Bricks for Charni Road, settled in units.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞