RMC supplier on barter for Kalbadevi sites: m20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units.
Kalbadevi is the textile and hardware market district, Mumbadevi Temple, Zaveri Bazaar on one side and Crawford Market on the other, with hundreds of cessed buildings that have been on the cluster-redevelopment list for years.
Cluster redevelopment under 33(9) is the only viable route: entire blocks of tenanted buildings replaced by towers with shops, godowns and rehab flats plus a sale component.
Concrete arrives in 4 and 6 cu m transit mixers rather than the standard 7 and 8, with a stationary pump at the lane mouth and pipeline into the building; slab pours are split across two nights when the lane cannot hold more than two mixers.
Redevelopment plots here pour small slabs of 150 to 300 cu m, so we plan night pours with two or three mixers cycling from the nearest plant.
Traders who own shops here buy the sale flats above to stay close to their businesses; commercial units are the real prize. That is who our inventory desk sells to when we take units here, which is why material-only barter in Kalbadevi is typically 10–18% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Kalbadevi for a single settlement at 35% below market.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply ready-mix concrete to projects in Kalbadevi and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
6 cu m minimum; project supply 5,000 to 60,000 cu m Smaller requirements can be clubbed with a neighbouring site in Kalbadevi if the timing works.
Concrete arrives in 4 and 6 cu m transit mixers rather than the standard 7 and 8, with a stationary pump at the lane mouth and pipeline into the building; slab pours are split across two nights when the lane cannot hold more than two mixers.
For material-only supply in Kalbadevi the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Kalbadevi:
Send the BOQ and the units you can allot. Proposal in 48 hours.