10 mm and 20 mm metal, crushed sand (M-sand), plaster sand and GSB from licensed quarries, brass-wise delivery, settled against flats. Serving Nerul and the rest of Navi Mumbai.
Nerul is the Seawoods lake, Palm Beach Road, Nerul West's CIDCO sectors, the DY Patil campus and a belt of 1990s buildings entering redevelopment.
CIDCO-society redevelopment of 12 to 22 floors and high-rise launches of 25 to 40 floors on Palm Beach Road; 2 and 3 BHKs.
Redevelopment sites here have no stacking space, so aggregate is mostly for backfill and plinth work; the structure runs on ready-mix.
12-wheeler tippers direct from the quarry into stockpiles for the site batching plant; daily supply during the structure phase.
Families from Nerul and Vashi, college-linked buyers and Palm Beach Road upgraders. That is who our inventory desk sells to when we take units here, which is why material-only barter in Nerul is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Nerul, the flats are taken at 35% below market and one work order covers structure and material.
| Materials | 10 mm, 20 mm, 40 mm aggregate; crushed sand, plaster sand, GSB, WMM |
|---|---|
| Source | Licensed quarries in Panvel, Khopoli, Wada and Bhiwandi belts |
| Lot size | 1 brass minimum; project supply 2,000 to 50,000 brass |
| Delivery | 10-wheeler and 12-wheeler tippers, night delivery for city sites |
| Pricing basis | Per brass delivered, royalty and transport included |
| Documents | Royalty receipt, weighbridge, GST invoice |
Yes. We supply aggregates & sand to projects in Nerul and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
10-wheeler and 12-wheeler tippers, night delivery for city sites Smaller requirements can be clubbed with a neighbouring site in Nerul if the timing works.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Yes. Most developers bundle aggregates & sand with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Other services in Nerul:
Send the BOQ and the units you can allot. Proposal in 48 hours.