Aggregate and sand supplier on barter for Colaba sites: 10 mm and 20 mm metal, crushed sand (M-sand), plaster sand and GSB from licensed quarries, brass-wise delivery, settled against flats.
Colaba runs from Regal Circle down to Navy Nagar, a long thin strip where Grade II heritage blocks, 1960s societies and the odd plot behind Colaba Causeway sit within a few hundred metres of each other.
What comes up here is boutique: 12 to 25 flats per building, large 3 and 4 BHKs, sea-facing on the Cuffe Parade side, and almost always a redevelopment of an existing society rather than a fresh plot.
Luxury towers here run on ready-mix; aggregate supply is for basements, backfill, road work and landscaping.
Aggregate and crushed sand come in small tippers at night and are stacked in the plinth area; on very tight plots we supply site-batched concrete instead so no aggregate needs storing.
Buyers are old Colaba families upgrading within the neighbourhood and corporate tenants; resale is quick because supply is so limited. That is who our inventory desk sells to when we take units here, which is why material-only barter in Colaba is typically 8–15% below the developer's rate rather than deeper.
Aggregates are usually bundled with RMC or supplied separately for site-batched concrete and backfilling. Combine it with barter contracting in Colaba for a single settlement at 35% below market.
| Materials | 10 mm, 20 mm, 40 mm aggregate; crushed sand, plaster sand, GSB, WMM |
|---|---|
| Source | Licensed quarries in Panvel, Khopoli, Wada and Bhiwandi belts |
| Lot size | 1 brass minimum; project supply 2,000 to 50,000 brass |
| Delivery | 10-wheeler and 12-wheeler tippers, night delivery for city sites |
| Pricing basis | Per brass delivered, royalty and transport included |
| Documents | Royalty receipt, weighbridge, GST invoice |
Yes. We supply aggregates & sand to projects in Colaba and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
10-wheeler and 12-wheeler tippers, night delivery for city sites Smaller requirements can be clubbed with a neighbouring site in Colaba if the timing works.
1 brass minimum; project supply 2,000 to 50,000 brass. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Colaba:
Send the BOQ and the units you can allot. Proposal in 48 hours.