RMC supplier on barter for Jogeshwari sites: m20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units.
Jogeshwari is JVLR, the caves, SV Road and the SRA and society belts on both sides of the highway, with Metro lines now crossing the area.
SRA schemes producing rehab and sale wings of 20 to 30 floors, and society redevelopment of 12 to 20 floors along SV Road and JVLR.
Rehab wings here are poured on tight budgets and sale wings on tight schedules; we hold one mix-design approval across both.
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
Families from Jogeshwari and Goregaon, and buyers priced out of Andheri who want the Metro. That is who our inventory desk sells to when we take units here, which is why material-only barter in Jogeshwari is typically 12–20% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Jogeshwari for a single settlement at 35% below market.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply ready-mix concrete to projects in Jogeshwari and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
6 cu m minimum; project supply 5,000 to 60,000 cu m Smaller requirements can be clubbed with a neighbouring site in Jogeshwari if the timing works.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Jogeshwari:
Send the BOQ and the units you can allot. Proposal in 48 hours.