RMC supplier on barter for Malabar Hill sites: m20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units.
Malabar Hill is Ridge Road, Napean Sea Road, Walkeshwar's temple slope and the Hanging Gardens, with 1960s and 70s society buildings on steep plots that command the highest prices in India.
Society redevelopment into 20 to 35-storey luxury towers with 4 and 5 BHK plates, private lifts and, on the western slope, uninterrupted sea views.
Luxury towers here specify M50 to M60 for cores and columns, self-compacting mixes for congested reinforcement, and pumped placement above 40 floors.
Mixers stop at the road and a stationary pump pushes concrete up the slope; pour rates are lower, so we plan smaller pour zones and retarded mixes to avoid cold joints.
Industrialist and legacy families already living on the Hill, plus a few international buyers; each flat sells individually, not in launches. That is who our inventory desk sells to when we take units here, which is why material-only barter in Malabar Hill is typically 8–15% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Malabar Hill for a single settlement at 35% below market.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply ready-mix concrete to projects in Malabar Hill and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Mixers stop at the road and a stationary pump pushes concrete up the slope; pour rates are lower, so we plan smaller pour zones and retarded mixes to avoid cold joints.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Other services in Malabar Hill:
Send the BOQ and the units you can allot. Proposal in 48 hours.