RMC supplier on barter · Lokhandwala

Ready-Mix Concrete on barter in Lokhandwala

M20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units. Serving Lokhandwala and the rest of Western Suburbs.

Home / Services / Ready-Mix Concrete Mumbai / Lokhandwala
Lokhandwala · Western Suburbs · Western line

Lokhandwala: ready-mix concrete on barter

Lokhandwala Complex and Four Bungalows are 1980s planned townships: wide internal roads, the back road market, and hundreds of 8 to 12-storey societies that are now 40 years old and due for redevelopment.

Society redevelopment into 20 to 30-storey buildings with 2 and 3 BHKs; plot sizes are uniform and shapes regular, which suits Mivan.

Redevelopment plots here pour small slabs of 150 to 300 cu m, so we plan night pours with two or three mixers cycling from the nearest plant.

Boom pumps of 36 to 52 m reach most of the plate directly, mixers queue on site, and large slab pours run continuously; on the bigger plots we set up a site batching plant.

Film and TV industry families and Andheri West buyers who want the Lokhandwala address. That is who our inventory desk sells to when we take units here, which is why material-only barter in Lokhandwala is typically 10–18% below the developer's rate rather than deeper.

Bundled with contracting in Lokhandwala, the flats are taken at 35% below market and one work order covers structure and material.

Ready-Mix
Ready-Mix Concrete · Lokhandwala · good road access and room for a proper yard
Specification

Grades, brands and lot sizes

GradesM20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes
PlantsPartner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity
PumpingBoom pumps (36–52 m), stationary pumps, night-pour slots for slab casts
Lot size6 cu m minimum; project supply 5,000 to 60,000 cu m
Pricing basisPer cu m grade-wise, pumping and transit charges itemised
QualityCube test reports, slump at site, mix design approval from your PMC
Process

How a deal runs

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

FAQ for Lokhandwala developers

Do you supply ready-mix concrete in Lokhandwala on barter against flats?

Yes. We supply ready-mix concrete to projects in Lokhandwala and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Can we settle partly in cash and partly in units for ready-mix concrete in Lokhandwala?

Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.

How do deliveries work at Lokhandwala sites?

Boom pumps of 36 to 52 m reach most of the plate directly, mixers queue on site, and large slab pours run continuously; on the bigger plots we set up a site batching plant.

Is there a minimum order for Lokhandwala?

6 cu m minimum; project supply 5,000 to 60,000 cu m Smaller requirements can be clubbed with a neighbouring site in Lokhandwala if the timing works.

What if material prices move during supply to Lokhandwala?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

What documents come with each delivery to Lokhandwala?

Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.

Settlement

Three ways to pay for the work

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Also serving

Around Lokhandwala

Other services in Lokhandwala:

Searches this page answers
m30 concrete price lokhandwalarmc rate per cubic meter lokhandwalaconcrete supplier lokhandwalaready mix concrete on barter lokhandwalarmc plant lokhandwalaboom pump concrete lokhandwalarmc against flats lokhandwalarmc supplier western suburbsready mix concrete on barter western suburbsrmc plant western suburbsready-mix concrete against flats lokhandwalabarter construction lokhandwalaconstruction material supplier lokhandwala

Send the Lokhandwala BOQ.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞