Supply of ready-mix concrete to Virar projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Virar is the end of the Western line: Virar West's Global City and Bolinj, Virar East's Chandansar and Manvelpada, Arnala beach and townships that sell thousands of affordable flats a year.
Township-scale affordable housing of 7 to 22 floors with 1 and 2 BHKs, and low-rise row-houses on the Bolinj side.
Affordable projects here work on M25 to M30 and price per cu m matters more than anything; our plant partners in the belt keep haul distances short.
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
First-time buyers from the western suburbs and Vasai-Virar, and investors buying on the Virar–Alibaug corridor plan. That is who our inventory desk sells to when we take units here, which is why material-only barter in Virar is typically 15–25% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Virar for a single settlement at 35% below market.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply ready-mix concrete to projects in Virar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
For material-only supply in Virar the barter rate is usually 15–25% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
Other services in Virar:
Send the BOQ and the units you can allot. Proposal in 48 hours.