Supply of ready-mix concrete to Kharghar projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Township slabs here run to 1,000 cu m a night; we set up on-site batching when the phase exceeds about 15,000 cu m.
Kharghar is the golf course, Central Park, the hills, Sector 35 and the belt of high-rise townships that made it Navi Mumbai's fastest-growing node.
High-rise townships of 25 to 45 floors with 1, 2 and 3 BHKs, clubhouses and podiums; Mivan construction throughout.
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
IT and corporate professionals from Belapur and Airoli, families from Mumbai's eastern suburbs, and investors buying on the airport. That is who our inventory desk sells to when we take units here, which is why material-only barter in Kharghar is typically 10–15% below the developer's rate rather than deeper.
Bundled with contracting in Kharghar, the flats are taken at 35% below market and one work order covers structure and material.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply ready-mix concrete to projects in Kharghar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
For material-only supply in Kharghar the barter rate is usually 10–15% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Kharghar:
Send the BOQ and the units you can allot. Proposal in 48 hours.