M20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units. Serving Khar and the rest of Western Suburbs.
Khar West is the quieter neighbour to Bandra: 16th to 20th Road, Khar Danda, Union Park and Pali Hill's back slope, full of 1960s and 70s societies on tree-lined roads.
Luxury towers here specify M50 to M60 for cores and columns, self-compacting mixes for congested reinforcement, and pumped placement above 40 floors.
Society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs; Khar Danda and the sea-facing edge are CRZ-controlled.
Standard transit mixers work at night with a boom pump on the main road or a stationary pump for the inner sites; slab pours are scheduled in one continuous night window.
Families from Khar and Bandra who want new stock at slightly lower rates than Bandra West. That is who our inventory desk sells to when we take units here, which is why material-only barter in Khar is typically 8–15% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Khar for a single settlement at 35% below market.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply ready-mix concrete to projects in Khar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Standard transit mixers work at night with a boom pump on the main road or a stationary pump for the inner sites; slab pours are scheduled in one continuous night window.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
For material-only supply in Khar the barter rate is usually 8–15% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Other services in Khar:
Send the BOQ and the units you can allot. Proposal in 48 hours.