RMC supplier on barter for Lalbaug sites: m20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units.
Redevelopment plots here pour small slabs of 150 to 300 cu m, so we plan night pours with two or three mixers cycling from the nearest plant.
Lalbaug is Ganesh Galli, the Lalbaugcha Raja pandal, the Lalbaug flyover and dense Marathi chawls that are being rebuilt one society at a time along Dr Ambedkar Road and the lanes behind.
Chawl and society redevelopment into 20 to 30-storey buildings with rehab floors and 1 and 2 BHK sale flats, several with a Ganesh-pandal view that matters to buyers here.
Concrete arrives in 4 and 6 cu m transit mixers rather than the standard 7 and 8, with a stationary pump at the lane mouth and pipeline into the building; slab pours are split across two nights when the lane cannot hold more than two mixers.
Maharashtrian families from the same chawls and the neighbouring Parel and Chinchpokli wards. That is who our inventory desk sells to when we take units here, which is why material-only barter in Lalbaug is typically 10–18% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Lalbaug for a single settlement at 35% below market.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply ready-mix concrete to projects in Lalbaug and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
6 cu m minimum; project supply 5,000 to 60,000 cu m Smaller requirements can be clubbed with a neighbouring site in Lalbaug if the timing works.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Other services in Lalbaug:
Send the BOQ and the units you can allot. Proposal in 48 hours.