RMC supplier on barter for Ghodbunder Road sites: m20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units.
Ghodbunder Road runs from Majiwada to the creek at Gaimukh, past Manpada, Kasarvadavali, Owale and Bhayanderpada, with one township after another on both sides.
Township-scale projects of 25 to 50 floors with 1, 2 and 3 BHKs, Mivan construction, large podiums and clubhouses.
Township slabs here run to 1,000 cu m a night; we set up on-site batching when the phase exceeds about 15,000 cu m.
Transit mixers come straight off the highway, boom pumps handle the podium and lower floors, and stationary pumps with placing booms take over above 20 floors; site batching is set up on the larger townships.
First-time and upgrade buyers from Thane and Mulund, and investors buying on the Metro and coastal-road plans. That is who our inventory desk sells to when we take units here, which is why material-only barter in Ghodbunder Road is typically 10–15% below the developer's rate rather than deeper.
Bundled with contracting in Ghodbunder Road, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply ready-mix concrete to projects in Ghodbunder Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
For material-only supply in Ghodbunder Road the barter rate is usually 10–15% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m
Other services in Ghodbunder Road:
Send the BOQ and the units you can allot. Proposal in 48 hours.