M20 to M60 design-mix concrete from certified batching plants, transit mixers and boom pumps included, settled against residential or commercial units. Serving Powai and the rest of Eastern Suburbs.
Powai is Hiranandani Gardens, IIT Bombay, the lake, Chandivali and the office parks that made it the eastern suburbs' most planned neighbourhood.
Township slabs here run to 1,000 cu m a night; we set up on-site batching when the phase exceeds about 15,000 cu m.
Township-scale residential of 30 to 60 floors with clubhouses, IT-park commercial and hillside plots along Powai Lake; 2 to 4 BHKs.
Boom pumps of 36 to 52 m reach most of the plate directly, mixers queue on site, and large slab pours run continuously; on the bigger plots we set up a site batching plant.
IT and finance professionals working in Powai and BKC, IIT-linked families and investors buying for the corporate rental market. That is who our inventory desk sells to when we take units here, which is why material-only barter in Powai is typically 10–15% below the developer's rate rather than deeper.
Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Powai for a single settlement at 35% below market.
| Grades | M20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes |
|---|---|
| Plants | Partner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity |
| Pumping | Boom pumps (36–52 m), stationary pumps, night-pour slots for slab casts |
| Lot size | 6 cu m minimum; project supply 5,000 to 60,000 cu m |
| Pricing basis | Per cu m grade-wise, pumping and transit charges itemised |
| Quality | Cube test reports, slump at site, mix design approval from your PMC |
Yes. We supply ready-mix concrete to projects in Powai and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
For material-only supply in Powai the barter rate is usually 10–15% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Yes. Most developers bundle ready-mix concrete with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Boom pumps of 36 to 52 m reach most of the plate directly, mixers queue on site, and large slab pours run continuously; on the bigger plots we set up a site batching plant.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Powai:
Send the BOQ and the units you can allot. Proposal in 48 hours.