RMC supplier on barter · Marine Lines

Ready-Mix Concrete on barter in Marine Lines

Supply of ready-mix concrete to Marine Lines projects, priced at daily Mumbai rates and settled in flats or units instead of cash.

Home / Services / Ready-Mix Concrete Mumbai / Marine Lines
Marine Lines · South Mumbai · Western line

Ready-Mix Concrete for Marine Lines sites

Marine Lines stretches from the Marine Drive promenade back to Kalbadevi Road, a belt of 1940s to 1960s cessed buildings, Parsi colonies and the old Bombay Hospital lanes.

Cessed-building redevelopment under 33(7) dominates: 7 to 15-storey buildings with tenants rehoused and a sale component of compact 2 BHKs.

Redevelopment plots here pour small slabs of 150 to 300 cu m, so we plan night pours with two or three mixers cycling from the nearest plant.

Concrete arrives in 4 and 6 cu m transit mixers rather than the standard 7 and 8, with a stationary pump at the lane mouth and pipeline into the building; slab pours are split across two nights when the lane cannot hold more than two mixers.

Buyers are families from the same wards who want a modern flat without leaving the Marine Lines school and hospital belt. That is who our inventory desk sells to when we take units here, which is why material-only barter in Marine Lines is typically 10–18% below the developer's rate rather than deeper.

Typical structure: concrete for the full RCC frame of a 20-storey tower is settled against 1 to 3 units, released against slab milestones. Combine it with barter contracting in Marine Lines for a single settlement at 35% below market.

Ready-Mix
Ready-Mix Concrete · Marine Lines · tight lanes and night-only access
Specification

Grades, brands and lot sizes

GradesM20, M25, M30, M35, M40, M45, M50, M60; self-compacting and high-strength mixes
PlantsPartner plants across Mumbai, Navi Mumbai and Thane with 30–120 cu m/hr capacity
PumpingBoom pumps (36–52 m), stationary pumps, night-pour slots for slab casts
Lot size6 cu m minimum; project supply 5,000 to 60,000 cu m
Pricing basisPer cu m grade-wise, pumping and transit charges itemised
QualityCube test reports, slump at site, mix design approval from your PMC
Settlement

How the work order is settled

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

The process we follow

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Ready-Mix Concrete in Marine Lines: questions

Do you supply ready-mix concrete in Marine Lines on barter against flats?

Yes. We supply ready-mix concrete to projects in Marine Lines and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Can we settle partly in cash and partly in units for ready-mix concrete in Marine Lines?

Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.

How soon can supply start in Marine Lines?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. 6 cu m minimum; project supply 5,000 to 60,000 cu m

Is the Marine Lines barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

What documents come with each delivery to Marine Lines?

Cube test reports, slump at site, mix design approval from your PMC. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.

Who bears the risk of the units you receive in Marine Lines?

We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.

Also serving

Also working near Marine Lines

Other services in Marine Lines:

Searches this page answers
rmc plant marine linesrmc against flats marine linesm30 concrete price marine linesconcrete supplier marine linesrmc supplier marine linesready mix concrete supplier marine linesrmc rate per cubic meter marine linesrmc supplier south mumbaiready mix concrete on barter south mumbairmc plant south mumbaiready-mix concrete against flats marine linesbarter construction marine linesconstruction material supplier marine lines

Ready-Mix Concrete for Marine Lines, settled in units.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞