Barter contracting · Khar

Barter contractor in Khar

We run the site in Khar from demolition to plaster and settle in units at 35% below market, or half in units and half in cash, or plain cash. Your drawings, our quote, 72 hours.

Home / Barter contracting Mumbai / Khar
Khar · Western Suburbs · Western line

What Khar sites are like

Khar West is the quieter neighbour to Bandra: 16th to 20th Road, Khar Danda, Union Park and Pali Hill's back slope, full of 1960s and 70s societies on tree-lined roads.

Society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs; Khar Danda and the sea-facing edge are CRZ-controlled.

Access shapes the programme. Linking Road and SV Road take medium trucks; the numbered roads are narrow with heavy parking, so night deliveries.

Families from Khar and Bandra who want new stock at slightly lower rates than Bandra West. Khar redevelopments are mid-size, and one 2 or 3 BHK typically covers the structure package, so most deals here are 100% barter.

Towers in Khar are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

The deal, in one line: we build the structure in Khar, you allot flats at 35% below your current rate. Prefer to keep inventory? Take 50/50 or pay cash on RA bills; the quote shows all three.

Khar
Khar · workable roads with night delivery windows
Scope of work

Scope: demolition to plaster

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Settlement

Settlement options

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Quoting basis

Quoted from drawings, by technology

Towers in Khar are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Process

Step by step

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Questions we get from Khar developers

Do you take contracting work in Khar against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Khar against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

Do you supply materials on barter in Khar as well?

Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Khar, bundled into the contracting work order or as a separate supply agreement.

What does 35% below market mean in practice for Khar?

If flats in your Khar project are selling at ₹55,000/sq ft carpet, we value the flats we receive at about ₹35,750/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.

How do you handle site logistics in Khar?

Linking Road and SV Road take medium trucks; the numbered roads are narrow with heavy parking, so night deliveries. We plan deliveries, pours and crane time around those constraints and write realistic milestone dates into the work order.

Is a barter contract in Khar RERA-compliant?

Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.

What happens if the Khar project is delayed?

The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.

Which floors and flats do you take in Khar?

A mix agreed at signing, usually mid-floor units of the most saleable configuration in the project rather than the best or worst floors. The unit schedule is part of the barter MOU, and we can swap units by mutual consent before registration.

Why we hold flats here

Selling what we receive in Khar

Premium and ultra-luxury inventory in this belt has seen sustained absorption from end users and HNIs, so flats received on barter here are among the most liquid in our portfolio.

Families from Khar and Bandra who want new stock at slightly lower rates than Bandra West. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Other areas we cover

Material supply on barter in Khar:

Searches this page answers
excavation contractor kharbuilding contractor kharredevelopment contractor kharturnkey contractor kharconstruction contractor on barter kharmivan contractor kharconstruction company kharpiling contractor kharlabour contractor kharbarter contractor western suburbscontractor against flats western suburbsconstruction contractor on barter western suburbsconstruction against flats kharcontractor for redevelopment kharrcc construction khar

Building in Khar? Pay in flats.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞