Lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units. Serving Lokhandwala and the rest of Western Suburbs.
Lokhandwala Complex and Four Bungalows are 1980s planned townships: wide internal roads, the back road market, and hundreds of 8 to 12-storey societies that are now 40 years old and due for redevelopment.
Society redevelopment into 20 to 30-storey buildings with 2 and 3 BHKs; plot sizes are uniform and shapes regular, which suits Mivan.
Trailer-load pallets crane-unloaded into a block yard; we deliver wing by wing against the masonry programme.
Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.
Film and TV industry families and Andheri West buyers who want the Lokhandwala address. That is who our inventory desk sells to when we take units here, which is why material-only barter in Lokhandwala is typically 10–18% below the developer's rate rather than deeper.
Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Lokhandwala for a single settlement at 35% below market.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Yes. We supply aac blocks & bricks to projects in Lokhandwala and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Lokhandwala if the timing works.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Yes. Most developers bundle aac blocks & bricks with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Lokhandwala:
Send the BOQ and the units you can allot. Proposal in 48 hours.