Excavation, piling, RCC and civil work for projects in Airoli, quoted from your drawings and settled in flats of the same project at 35% below market. Or 50/50. Or cash.
Airoli is the Mulund–Airoli bridge, Mindspace's IT parks, the Thane–Belapur Road belt and residential sectors that fill with launches every year.
Township and IT-park-adjacent launches of 20 to 40 floors with 1, 2 and 3 BHKs; regular plots, Mivan.
Access shapes the programme. Thane–Belapur Road takes trailers; plots are large.
IT professionals from Mindspace and families from Mulund and Thane. Corporate rental demand keeps Airoli flats liquid; we take settlement in 1 and 2 BHKs near the IT parks.
Plots in Airoli are regular and floor plates repeat, so Mivan (aluminium formwork) is the first quote: monolithic walls and slabs on a 7-day cycle, formwork sets we own, and a lower per-sq-ft rate once the tower crosses 20 floors. We quote conventional RCC alongside for the podium and any irregular wing.
The deal, in one line: we build the structure in Airoli, you allot flats at 35% below your current rate. Prefer to keep inventory? Take 50/50 or pay cash on RA bills; the quote shows all three.
Each stage can be a separate work order or one continuous contract. Finishing is optional.
Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.
Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.
Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.
AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.
Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Plots in Airoli are regular and floor plates repeat, so Mivan (aluminium formwork) is the first quote: monolithic walls and slabs on a 7-day cycle, formwork sets we own, and a lower per-sq-ft rate once the tower crosses 20 floors. We quote conventional RCC alongside for the podium and any irregular wing.
Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.
Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.
Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We execute excavation, piling, RCC and civil work for projects in Airoli against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.
Flats are released only against PMC-certified work value, in tranches tied to milestones, so the developer never allots more than has been built. Escrow is available where the lender requires it.
If flats in your Airoli project are selling at ₹20,000/sq ft carpet, we value the flats we receive at about ₹13,000/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.
Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Airoli, bundled into the contracting work order or as a separate supply agreement.
Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.
From a single-building society redevelopment of about 20,000 sq ft built-up to multi-tower schemes. Below that size the documentation cost outweighs the benefit; above it there is no upper limit.
Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.
Township launches in this belt sell on amenities and connectivity; healthy launch-phase absorption means flats allotted to us are typically sold before the structure is complete.
IT professionals from Mindspace and families from Mulund and Thane. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.
Indicative only. Final barter rate depends on stage, floor, view and RERA status.
Material supply on barter in Airoli:
Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.