Barter contracting · Breach Candy

Barter contractor in Breach Candy

Excavation, piling, RCC and civil work for projects in Breach Candy, quoted from your drawings and settled in flats of the same project at 35% below market. Or 50/50. Or cash.

Home / Barter contracting Mumbai / Breach Candy
Breach Candy · South Mumbai · Western line

Breach Candy: the ground reality

Breach Candy is Bhulabhai Desai Road: the club, the hospital, the sea wall and a line of sea-facing society buildings from the 1960s that are being rebuilt into some of the most expensive flats in Asia.

Sea-facing redevelopment into 20 to 40-storey towers, full-floor or half-floor 4 and 5 BHKs, with marine-grade concrete and corrosion-resistant reinforcement specified throughout.

Access shapes the programme. Sea-side sites need CRZ clearance and corrosion-grade materials; the road takes 6-wheelers at night, cranes do the rest.

Old South Mumbai families and returning NRIs; a sea-facing flat here sells on the day it is offered. CRZ approvals delay starts by years, and once the CC arrives developers want structure done fast; we mobilise within 15 days and settle against one sea-facing flat.

Towers in Breach Candy are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

The deal, in one line: we build the structure in Breach Candy, you allot flats at 35% below your current rate. Prefer to keep inventory? Take 50/50 or pay cash on RA bills; the quote shows all three.

Breach
Breach Candy · CRZ rules and marine exposure
Scope of work

The work, stage by stage

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Quoting basis

Conventional, Mivan or traditional

Towers in Breach Candy are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Settlement

Settlement options

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

From drawings to registered flats

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

Before you call: Breach Candy FAQs

Do you take contracting work in Breach Candy against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Breach Candy against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

Can the Breach Candy contract be 50% barter and 50% payment?

Yes, and it is our most common structure for redevelopment schemes. The barter half is settled in flats at the agreed barter rate; the payment half is billed as running-account bills against PMC certification.

What size of project do you take in Breach Candy?

From a single-building society redevelopment of about 20,000 sq ft built-up to multi-tower schemes. Below that size the documentation cost outweighs the benefit; above it there is no upper limit.

What protection does the developer have in Breach Candy?

Flats are released only against PMC-certified work value, in tranches tied to milestones, so the developer never allots more than has been built. Escrow is available where the lender requires it.

What happens if the Breach Candy project is delayed?

The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.

What does 35% below market mean in practice for Breach Candy?

If flats in your Breach Candy project are selling at ₹55,000/sq ft carpet, we value the flats we receive at about ₹35,750/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.

How do you handle site logistics in Breach Candy?

Sea-side sites need CRZ clearance and corrosion-grade materials; the road takes 6-wheelers at night, cranes do the rest. We plan deliveries, pours and crane time around those constraints and write realistic milestone dates into the work order.

Why we hold flats here

Selling what we receive in Breach Candy

Premium and ultra-luxury inventory in this belt has seen sustained absorption from end users and HNIs, so flats received on barter here are among the most liquid in our portfolio.

Old South Mumbai families and returning NRIs; a sea-facing flat here sells on the day it is offered. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Other areas we cover

Material supply on barter in Breach Candy:

Searches this page answers
piling contractor breach candyexcavation contractor breach candybarter contractor breach candylabour contractor breach candyrcc contractor breach candycontractor against flats breach candyconstruction company breach candyredevelopment contractor breach candyconstruction contractor on barter breach candybarter contractor south mumbaicontractor against flats south mumbaiconstruction contractor on barter south mumbaiconstruction against flats breach candycontractor for redevelopment breach candyrcc construction breach candy

Send the Breach Candy drawings.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞