Barter contracting · Antop Hill

Barter contractor in Antop Hill

We run the site in Antop Hill from demolition to plaster and settle in units at 35% below market, or half in units and half in cash, or plain cash. Your drawings, our quote, 72 hours.

Home / Barter contracting Mumbai / Antop Hill
Antop Hill · Central Mumbai · Harbour line

Working in Antop Hill

Antop Hill is the CGS colony, the Wadala East and Sangam Nagar slopes, and the MHADA colonies between the Monorail and the Eastern Freeway.

Government-colony and MHADA redevelopment producing 20 to 30-storey rehab and sale wings, with mid-income 1 and 2 BHKs.

Access shapes the programme. Freeway access is good; colony roads are moderate with slope on the hill side.

Central-government employees from the colony and families from Wadala and Sion looking for entry-level prices in the island city. Colony redevelopments are large and slow-moving; a contractor who can wait for settlement in flats rather than monthly bills is a better fit.

Redevelopment plots in Antop Hill vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

What we offer in Antop Hill: excavation, piling, RCC and civil work quoted from your drawings and elevation, settled in flats of the same project at 35% below market, or half in flats and half on RA bills, or fully in cash.

Antop
Antop Hill · workable roads with night delivery windows
Scope of work

Excavation to civil, in sequence

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Settlement

Settlement options

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Quoting basis

How we quote in Antop Hill

Redevelopment plots in Antop Hill vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Process

The process we follow

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Before you call: Antop Hill FAQs

Do you take contracting work in Antop Hill against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Antop Hill against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

What does 35% below market mean in practice for Antop Hill?

If flats in your Antop Hill project are selling at ₹22,000/sq ft carpet, we value the flats we receive at about ₹14,300/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.

Do you supply materials on barter in Antop Hill as well?

Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Antop Hill, bundled into the contracting work order or as a separate supply agreement.

Which floors and flats do you take in Antop Hill?

A mix agreed at signing, usually mid-floor units of the most saleable configuration in the project rather than the best or worst floors. The unit schedule is part of the barter MOU, and we can swap units by mutual consent before registration.

What happens if the Antop Hill project is delayed?

The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.

Who sells the flats you receive in Antop Hill?

We do, through our inventory desk, or we hold them. The developer's sales team is not involved and there is no conflict with their pricing; our units are sold at a market-linked rate, not undercut.

What size of project do you take in Antop Hill?

From a single-building society redevelopment of about 20,000 sq ft built-up to multi-tower schemes. Below that size the documentation cost outweighs the benefit; above it there is no upper limit.

Why we hold flats here

Selling what we receive in Antop Hill

New-launch sales here track infrastructure: metro lines, coastal road and flyover links have widened the buyer pool for mid-income flats, which supports our barter appetite.

Central-government employees from the colony and families from Wadala and Sion looking for entry-level prices in the island city. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Also working near Antop Hill

Material supply on barter in Antop Hill:

Searches this page answers
turnkey contractor antop hillpiling contractor antop hillconstruction company antop hillconstruction contractor on barter antop hillexcavation contractor antop hillredevelopment contractor antop hillbuilding contractor antop hilllabour contractor antop hillmivan contractor antop hillbarter contractor central mumbaicontractor against flats central mumbaiconstruction contractor on barter central mumbaiconstruction against flats antop hillcontractor for redevelopment antop hillrcc construction antop hill

Antop Hill structure, settled in units.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞