Barter contracting · Sion

Barter contractor in Sion

A structure contractor for Sion that takes flats instead of RA bills: 35% below your rate, registered ATS, escrow release. Half-barter and cash contracts too.

Home / Barter contracting Mumbai / Sion
Sion · Central Mumbai · Central line

Working in Sion

Sion is the Sion Circle, the hospital, Pratiksha Nagar, the Dharavi edge and the Gujarati and South Indian societies along Sion–Trombay Road and Sion East.

Families from Sion and Matunga, plus buyers from Chembur and Kurla wanting a central address. Dharavi redevelopment will change Sion's supply picture; we prefer phase-wise barter here with rate resets every twelve months.

Society redevelopment of 15 to 25 floors and SRA schemes on the Dharavi and Pratiksha Nagar side producing rehab wings and mid-income sale wings.

Access shapes the programme. Eastern Express Highway and Sion–Trombay Road take trailers; inner colony roads are moderate.

Redevelopment plots in Sion vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

The deal, in one line: we build the structure in Sion, you allot flats at 35% below your current rate. Prefer to keep inventory? Take 50/50 or pay cash on RA bills; the quote shows all three.

Sion
Sion · good road access and room for a proper yard
Scope of work

What we take on

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Quoting basis

Quoted from drawings, by technology

Redevelopment plots in Sion vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

Settlement

How the work order is settled

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

The process we follow

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Before you call: Sion FAQs

Do you take contracting work in Sion against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Sion against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

Who sells the flats you receive in Sion?

We do, through our inventory desk, or we hold them. The developer's sales team is not involved and there is no conflict with their pricing; our units are sold at a market-linked rate, not undercut.

Can the society or the PMC vet Barter Constructions before the Sion development agreement is signed?

Yes, and we encourage it. We share our execution record, machinery list, formwork inventory and references, and attend society meetings with the developer when asked.

What happens if the Sion project is delayed?

The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.

How do you handle site logistics in Sion?

Eastern Express Highway and Sion–Trombay Road take trailers; inner colony roads are moderate. We plan deliveries, pours and crane time around those constraints and write realistic milestone dates into the work order.

Can the Sion contract be 50% barter and 50% payment?

Yes, and it is our most common structure for redevelopment schemes. The barter half is settled in flats at the agreed barter rate; the payment half is billed as running-account bills against PMC certification.

How do you arrive at a quote for a Sion project?

From your architectural and structural drawings, elevation and floor plates. We take off quantities and quote per sq ft built-up or item-rate BOQ, showing conventional RCC, Mivan and traditional construction side by side where more than one applies.

Why we hold flats here

Sion flats: our exit

New-launch sales here track infrastructure: metro lines, coastal road and flyover links have widened the buyer pool for mid-income flats, which supports our barter appetite.

Families from Sion and Matunga, plus buyers from Chembur and Kurla wanting a central address. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Neighbouring areas

Material supply on barter in Sion:

Searches this page answers
contractor against flats sionbarter contractor sionmivan contractor sionpiling contractor sionconstruction company sionexcavation contractor sionbuilding contractor sioncivil contractor sionconstruction contractor on barter sionbarter contractor central mumbaicontractor against flats central mumbaiconstruction contractor on barter central mumbaiconstruction against flats sioncontractor for redevelopment sionmivan construction sion

Sion structure, settled in units.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞