A structure contractor for Byculla that takes flats instead of RA bills: 35% below your rate, registered ATS, escrow release. Half-barter and cash contracts too.
Byculla is the zoo, the Bhau Daji Lad museum, Mustafa Bazaar and the mill and SRA land on both sides of the station, where 60-storey towers now rise next to century-old chawls.
Access shapes the programme. Byculla East has wide roads and large compounds; the West side near the bazaar is congested and night-only.
High-rise on mill and SRA plots: 40 to 65 floors, Mivan construction, 2 and 3 BHK sale wings alongside rehab buildings.
Redevelopment plots in Byculla vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.
Byculla's Muslim and Christian trading families, professionals moving from the suburbs for a South Mumbai address, and investors buying early in SRA sale wings. SRA schemes must finish rehab before selling; barter funds the rehab structure and we take our settlement in the sale wing.
What we offer in Byculla: excavation, piling, RCC and civil work quoted from your drawings and elevation, settled in flats of the same project at 35% below market, or half in flats and half on RA bills, or fully in cash.
Each stage can be a separate work order or one continuous contract. Finishing is optional.
Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.
Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.
Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.
AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.
Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Redevelopment plots in Byculla vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.
Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.
Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.
Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We execute excavation, piling, RCC and civil work for projects in Byculla against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.
From your architectural and structural drawings, elevation and floor plates. We take off quantities and quote per sq ft built-up or item-rate BOQ, showing conventional RCC, Mivan and traditional construction side by side where more than one applies.
From a single-building society redevelopment of about 20,000 sq ft built-up to multi-tower schemes. Below that size the documentation cost outweighs the benefit; above it there is no upper limit.
Yes. TMT, ready-mix concrete, cement, aggregates, AAC blocks, structural steel and finishing materials are all available on barter in Byculla, bundled into the contracting work order or as a separate supply agreement.
If flats in your Byculla project are selling at ₹22,000/sq ft carpet, we value the flats we receive at about ₹14,300/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.
A mix agreed at signing, usually mid-floor units of the most saleable configuration in the project rather than the best or worst floors. The unit schedule is part of the barter MOU, and we can swap units by mutual consent before registration.
Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.
New-launch sales here track infrastructure: metro lines, coastal road and flyover links have widened the buyer pool for mid-income flats, which supports our barter appetite.
Byculla's Muslim and Christian trading families, professionals moving from the suburbs for a South Mumbai address, and investors buying early in SRA sale wings. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.
Indicative only. Final barter rate depends on stage, floor, view and RERA status.
Material supply on barter in Byculla:
Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.