Barter contracting · Chembur

Barter contractor in Chembur

Excavation, piling, RCC and civil work for projects in Chembur, quoted from your drawings and settled in flats of the same project at 35% below market. Or 50/50. Or cash.

Home / Barter contracting Mumbai / Chembur
Chembur · Eastern Suburbs · Harbour line

What Chembur sites are like

Chembur is Chembur Camp, Tilak Nagar, Sindhi Society, Diamond Garden, the refineries on the east and the RCF colony, with the Eastern Freeway and Monorail now linking it to the island city.

Society redevelopment of 15 to 25 floors with 2 and 3 BHKs in Chembur Camp and Sindhi Society, and larger towers along the Freeway.

Sindhi, South Indian and Maharashtrian families from the same societies, plus buyers from Ghatkopar and Sion. Chembur societies are large and organised; developers keep cash for corpus and rent and settle structure work in flats.

Access shapes the programme. Eastern Freeway and Sion–Trombay Road take trailers; society lanes are moderate.

Redevelopment plots in Chembur vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

What we offer in Chembur: excavation, piling, RCC and civil work quoted from your drawings and elevation, settled in flats of the same project at 35% below market, or half in flats and half on RA bills, or fully in cash.

Chembur
Chembur · highway access for trailer-load deliveries
Settlement

Settlement options

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Scope of work

Excavation to civil, in sequence

Each stage can be a separate work order or one continuous contract. Finishing is optional.

1

Excavation & shoring

Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.

2

Piling & foundation

Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.

3

RCC structure

Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.

4

Civil & masonry

AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.

5

Finishing (optional)

Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.

Quoting basis

How we quote in Chembur

Redevelopment plots in Chembur vary, so we quote both: conventional RCC for irregular footprints and podium-and-tower layouts, Mivan where the plate repeats for 20 floors or more. The quote shows both rates so the developer can choose.

Conventional RCC

Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.

Mivan / aluminium formwork

Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.

Traditional / load-bearing

Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.

FAQ

Before you call: Chembur FAQs

Do you take contracting work in Chembur against flats?

Yes. We execute excavation, piling, RCC and civil work for projects in Chembur against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.

How do you arrive at a quote for a Chembur project?

From your architectural and structural drawings, elevation and floor plates. We take off quantities and quote per sq ft built-up or item-rate BOQ, showing conventional RCC, Mivan and traditional construction side by side where more than one applies.

What size of project do you take in Chembur?

From a single-building society redevelopment of about 20,000 sq ft built-up to multi-tower schemes. Below that size the documentation cost outweighs the benefit; above it there is no upper limit.

Is a barter contract in Chembur RERA-compliant?

Yes. Flats are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing as sold inventory. We work only with RERA-registered projects or projects where registration is in process.

What protection does the developer have in Chembur?

Flats are released only against PMC-certified work value, in tranches tied to milestones, so the developer never allots more than has been built. Escrow is available where the lender requires it.

Can the society or the PMC vet Barter Constructions before the Chembur development agreement is signed?

Yes, and we encourage it. We share our execution record, machinery list, formwork inventory and references, and attend society meetings with the developer when asked.

What happens if the Chembur project is delayed?

The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.

Process

From drawings to registered flats

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

Why we hold flats here

Demand in Chembur

Sales of redeveloped flats here are driven by families who want to stay in the neighbourhood; absorption of 1 and 2 BHK free-sale inventory is steady, which is why we are comfortable holding units in these projects.

Sindhi, South Indian and Maharashtrian families from the same societies, plus buyers from Ghatkopar and Sion. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.

Barter calculator
Barter rate ₹/sq ft (35% below market)
Carpet area allotted (sq ft)
≈ 2 BHK units (700 sq ft)

Indicative only. Final barter rate depends on stage, floor, view and RERA status.

Also serving

Other areas we cover

Material supply on barter in Chembur:

Searches this page answers
mivan contractor chemburexcavation contractor chemburturnkey contractor chemburredevelopment contractor chemburbuilding contractor chemburlabour contractor chemburpiling contractor chemburconstruction company chemburbarter contractor chemburbarter contractor eastern suburbscontractor against flats eastern suburbsconstruction contractor on barter eastern suburbsconstruction against flats chemburcontractor for redevelopment chemburmivan construction chembur

Send the Chembur drawings.

Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.

💬📞