A structure contractor for Tardeo that takes flats instead of RA bills: 35% below your rate, registered ATS, escrow release. Half-barter and cash contracts too.
Tardeo is where Mumbai's first true super-tall towers went up, around Tardeo Circle, Bhatia Hospital and the AC Market, with old textile godowns and mill land making way for towers of 50 floors and more.
High-rise on former industrial plots: 40 to 70 floors, Mivan or jump-form cores, large 3 and 4 BHK plates and multi-level podiums.
Access shapes the programme. Tardeo Road and Tulsiwadi take trailers; site yards are large enough for on-site batching.
Buyers are South Mumbai families and businessmen moving from Malabar Hill and Breach Candy to newer, larger flats with parking. Structure packages here run into hundreds of crores over five years; a phase-wise barter, with rate resets at each launch, is how we structure it.
Towers in Tardeo are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.
The deal, in one line: we build the structure in Tardeo, you allot flats at 35% below your current rate. Prefer to keep inventory? Take 50/50 or pay cash on RA bills; the quote shows all three.
Each stage can be a separate work order or one continuous contract. Finishing is optional.
Site clearance, demolition of the existing structure, debris disposal, excavation with sheet-pile or soldier-pile shoring for basements, dewatering.
Bored cast-in-situ piles, DMC piling, pile caps, rafts, retaining walls; pile load tests and PMC sign-off.
Columns, beams, slabs, shear walls, cores, podiums, water tanks. Conventional shuttering, Mivan (aluminium formwork) or tunnel-form as per the structural design.
AAC block work, internal and external plaster, waterproofing, screed, chajjas, parapets, compound wall.
Tiling, sanitary and CP, doors and windows, painting, MEP coordination up to OC-ready shell or fully finished flats.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Towers in Tardeo are tall, plates are large and finishes are premium, so we quote Mivan or jump-form for the core and conventional RCC for podiums and transfer levels, with M50-plus concrete and Fe550D reinforcement as the consultant specifies.
Ply-and-prop shuttering with cast-in-situ columns, beams and slabs. Suited to redevelopment plots with irregular footprints, podium-and-tower layouts and towers up to about 25 floors. Quoted per sq ft built-up or item-rate BOQ.
Monolithic walls and slabs cast together on a 7-day floor cycle. Suited to repetitive floor plates of 20 to 60 floors and large townships. We own formwork sets; the quote covers formwork, labour and material.
Brick or block load-bearing with RCC slabs for low-rise, bungalows, row-houses and G+3 society redevelopment in the suburbs and MMR. Lowest cost per sq ft; quoted per sq ft or lump-sum.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We execute excavation, piling, RCC and civil work for projects in Tardeo against a work order settled in flats, shops or units of the same project, valued at 35% below the project's current market rate. 50% barter + 50% payment and 100% payment contracts are also available.
Yes, and we encourage it. We share our execution record, machinery list, formwork inventory and references, and attend society meetings with the developer when asked.
Tardeo Road and Tulsiwadi take trailers; site yards are large enough for on-site batching. We plan deliveries, pours and crane time around those constraints and write realistic milestone dates into the work order.
Indicative quote within 72 hours of receiving drawings, site meeting within the week, signed work order and mobilisation within 15 days. Machinery, formwork and labour camps are our own.
The work order carries a milestone table with float. Delays caused by approvals or the developer pause our settlement clock; delays caused by us attract liquidated damages like any cash contract. Flats already released stay released.
If flats in your Tardeo project are selling at ₹55,000/sq ft carpet, we value the flats we receive at about ₹35,750/sq ft. Work-order value divided by that rate is the carpet area allotted to us, released against PMC-certified milestones.
From your architectural and structural drawings, elevation and floor plates. We take off quantities and quote per sq ft built-up or item-rate BOQ, showing conventional RCC, Mivan and traditional construction side by side where more than one applies.
Premium and ultra-luxury inventory in this belt has seen sustained absorption from end users and HNIs, so flats received on barter here are among the most liquid in our portfolio.
Buyers are South Mumbai families and businessmen moving from Malabar Hill and Breach Candy to newer, larger flats with parking. That is the pool our inventory desk sells into, and it is why we can offer 35% below market rather than a deeper discount.
Indicative only. Final barter rate depends on stage, floor, view and RERA status.
Material supply on barter in Tardeo:
Quote from drawings in 72 hours. 35% below market on barter flats, or 50/50, or cash.