Supply of cement to Kandivali projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Townships here take bulk cement into silos for batching plus bagged cement for masonry and plaster, both on one monthly-reset rate.
Kandivali is Thakur Village, Lokhandwala Township, Charkop, Mahavir Nagar and Poisar, with planned township pockets on the east and dense 1980s society belts on the west.
Society redevelopment of 15 to 25 floors in Charkop and Mahavir Nagar, and large-plot towers of 30 to 45 floors in Thakur Village and along the highway.
Bulk cement by bulker into site silos for the batching plant and bagged cement by the truck-load for finishing; the lowest landed cost we achieve in the city is on this belt.
Gujarati and Marathi families from the same societies, and buyers from Borivali and Malad. That is who our inventory desk sells to when we take units here, which is why material-only barter in Kandivali is typically 10–15% below the developer's rate rather than deeper.
Bundled with contracting in Kandivali, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Types | OPC 43/53, PPC, PSC, white cement, bulk cement (silo) |
|---|---|
| Brands | UltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1 |
| Lot size | 500 bags minimum; project supply 20,000 to 3,00,000 bags |
| Delivery | Truck-load to site, godown stocking near the project for daily lifting |
| Pricing basis | Brand-wise ex-depot rate + transport, monthly reset |
| Documents | Batch test certificate, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply cement to projects in Kandivali and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting
500 bags minimum; project supply 20,000 to 3,00,000 bags. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Truck-load to site, godown stocking near the project for daily lifting Smaller requirements can be clubbed with a neighbouring site in Kandivali if the timing works.
Bulk cement by bulker into site silos for the batching plant and bagged cement by the truck-load for finishing; the lowest landed cost we achieve in the city is on this belt.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Other services in Kandivali:
Send the BOQ and the units you can allot. Proposal in 48 hours.