Cement supplier on barter · Malad

Cement on barter in Malad

OPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project. Serving Malad and the rest of Western Suburbs.

Home / Services / Cement Mumbai / Malad
Malad · Western Suburbs · Western line

Malad: cement on barter

Malad is Mindspace, Inorbit, Malad West's Marve Road and Orlem, Kurar Village and the east-side societies along the highway, with the Madh–Versova link now planned.

SRA and society schemes here bundle cement into the RCC package so the developer has one settlement for the whole structure.

Society redevelopment of 15 to 25 floors on the west, mid-rise and SRA projects around Kurar, and commercial towers near Mindspace.

Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.

IT and BPO professionals from Mindspace, Catholic families from Orlem and buyers from Kandivali and Goregaon. That is who our inventory desk sells to when we take units here, which is why material-only barter in Malad is typically 12–20% below the developer's rate rather than deeper.

Bundled with contracting in Malad, the flats are taken at 35% below market and one work order covers structure and material.

Cement
Cement · Malad · workable roads with night delivery windows
Specification

Grades, brands and lot sizes

TypesOPC 43/53, PPC, PSC, white cement, bulk cement (silo)
BrandsUltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1
Lot size500 bags minimum; project supply 20,000 to 3,00,000 bags
DeliveryTruck-load to site, godown stocking near the project for daily lifting
Pricing basisBrand-wise ex-depot rate + transport, monthly reset
DocumentsBatch test certificate, GST invoice, e-way bill
Settlement

Barter, half-barter or cash

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

Step by step

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

FAQ for Malad developers

Do you supply cement in Malad on barter against flats?

Yes. We supply cement to projects in Malad and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

How soon can supply start in Malad?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting

What barter rate applies to a material-only deal in Malad?

For material-only supply in Malad the barter rate is usually 12–20% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.

Is there a minimum order for Malad?

Truck-load to site, godown stocking near the project for daily lifting Smaller requirements can be clubbed with a neighbouring site in Malad if the timing works.

Can we settle partly in cash and partly in units for cement in Malad?

Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.

Is the Malad barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

Also serving

Other areas we cover

Other services in Malad:

Searches this page answers
opc 53 cement price maladbulk cement supplier maladcement dealer maladcement supplier maladcement on barter maladcement against flats maladambuja cement dealer maladcement supplier western suburbscement dealer western suburbsultratech cement dealer western suburbscement against flats maladbarter construction maladconstruction material supplier malad

Cement for Malad, settled in units.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞