Cement supplier on barter for Naigaon sites: oPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project.
Naigaon is the first station in Vasai-Virar, with Naigaon East's Juchandra and Naigaon West's creek-side villages filling with affordable launches on the back of the Mira–Bhayandar Metro plan.
Affordable projects here want the lowest landed cost per bag; we quote brand alternatives and depot-direct pricing.
Affordable projects of 7 to 18 floors with 1 and 2 BHKs on village plots along the Naigaon–Juchandra road.
Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.
First-time buyers from Vasai, Mira Road and the western suburbs. That is who our inventory desk sells to when we take units here, which is why material-only barter in Naigaon is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Naigaon, the flats are taken at 35% below market and one work order covers structure and material.
| Types | OPC 43/53, PPC, PSC, white cement, bulk cement (silo) |
|---|---|
| Brands | UltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1 |
| Lot size | 500 bags minimum; project supply 20,000 to 3,00,000 bags |
| Delivery | Truck-load to site, godown stocking near the project for daily lifting |
| Pricing basis | Brand-wise ex-depot rate + transport, monthly reset |
| Documents | Batch test certificate, GST invoice, e-way bill |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply cement to projects in Naigaon and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.
Yes. Most developers bundle cement with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting
Truck-load to site, godown stocking near the project for daily lifting Smaller requirements can be clubbed with a neighbouring site in Naigaon if the timing works.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Other services in Naigaon:
Send the BOQ and the units you can allot. Proposal in 48 hours.