OPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project. Serving Mahim and the rest of Central Mumbai.
Redevelopment sites here use bagged cement for the whole job because there is no room for a silo; we feed daily from our godown.
Mahim is the Causeway, the church, the Mahim Koliwada, LJ Road and the Catholic and Muslim neighbourhoods between Dadar and Bandra where cluster and society redevelopment is picking up.
Society and cluster redevelopment of 15 to 25 floors with 2 and 3 BHKs; creek-facing plots on the Bandra side are CRZ-controlled.
Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.
Local Catholic and Muslim families, plus buyers priced out of Bandra who want to be a kilometre from it. That is who our inventory desk sells to when we take units here, which is why material-only barter in Mahim is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Mahim, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Types | OPC 43/53, PPC, PSC, white cement, bulk cement (silo) |
|---|---|
| Brands | UltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1 |
| Lot size | 500 bags minimum; project supply 20,000 to 3,00,000 bags |
| Delivery | Truck-load to site, godown stocking near the project for daily lifting |
| Pricing basis | Brand-wise ex-depot rate + transport, monthly reset |
| Documents | Batch test certificate, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply cement to projects in Mahim and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.
For material-only supply in Mahim the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting
Yes. Most developers bundle cement with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Other services in Mahim:
Send the BOQ and the units you can allot. Proposal in 48 hours.