Cement supplier on barter · Vashi

Cement on barter in Vashi

Cement supplier on barter for Vashi sites: oPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project.

Home / Services / Cement Mumbai / Vashi
Vashi · Navi Mumbai · Navi Mumbai

Cement for Vashi sites

Vashi is Navi Mumbai's oldest node: Sector 17's market, the APMC, Sector 30's Inorbit belt, Palm Beach Road and hundreds of CIDCO-built 1980s buildings that are now under redevelopment.

CIDCO-society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs, and commercial towers on Palm Beach Road and Sector 30.

Redevelopment sites here use bagged cement for the whole job because there is no room for a silo; we feed daily from our godown.

Bulk cement by bulker into a site silo for the batching plant, plus bagged cement for masonry and plaster in truck-loads.

Families from Vashi and Sanpada who have lived in CIDCO buildings for decades and want to stay. That is who our inventory desk sells to when we take units here, which is why material-only barter in Vashi is typically 10–18% below the developer's rate rather than deeper.

Cement is usually bundled with TMT or RMC in one barter agreement so the full RCC package is covered by one settlement. Combine it with barter contracting in Vashi for a single settlement at 35% below market.

Cement
Cement · Vashi · good road access and room for a proper yard
Specification

Grades, brands and lot sizes

TypesOPC 43/53, PPC, PSC, white cement, bulk cement (silo)
BrandsUltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1
Lot size500 bags minimum; project supply 20,000 to 3,00,000 bags
DeliveryTruck-load to site, godown stocking near the project for daily lifting
Pricing basisBrand-wise ex-depot rate + transport, monthly reset
DocumentsBatch test certificate, GST invoice, e-way bill
FAQ

Common questions about Cement in Vashi

Do you supply cement in Vashi on barter against flats?

Yes. We supply cement to projects in Vashi and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Is there a minimum order for Vashi?

Truck-load to site, godown stocking near the project for daily lifting Smaller requirements can be clubbed with a neighbouring site in Vashi if the timing works.

What documents come with each delivery to Vashi?

Batch test certificate, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.

How soon can supply start in Vashi?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting

What if material prices move during supply to Vashi?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

Can cement be bundled with contracting in Vashi?

Yes. Most developers bundle cement with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.

Settlement

Barter, half-barter or cash

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

Step by step

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

Also serving

Neighbouring areas

Other services in Vashi:

Searches this page answers
opc 53 cement price vashicement supplier vashicement against flats vashicement dealer vashicement on barter vashiambuja cement dealer vashibulk cement supplier vashicement supplier navi mumbaicement dealer navi mumbaiultratech cement dealer navi mumbaicement against flats vashibarter construction vashiconstruction material supplier vashi

Need cement in Vashi without paying cash?

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞