OPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project. Serving Sion and the rest of Central Mumbai.
SRA and society schemes here bundle cement into the RCC package so the developer has one settlement for the whole structure.
Sion is the Sion Circle, the hospital, Pratiksha Nagar, the Dharavi edge and the Gujarati and South Indian societies along Sion–Trombay Road and Sion East.
Society redevelopment of 15 to 25 floors and SRA schemes on the Dharavi and Pratiksha Nagar side producing rehab wings and mid-income sale wings.
Bulk cement by bulker into a site silo for the batching plant, plus bagged cement for masonry and plaster in truck-loads.
Families from Sion and Matunga, plus buyers from Chembur and Kurla wanting a central address. That is who our inventory desk sells to when we take units here, which is why material-only barter in Sion is typically 12–20% below the developer's rate rather than deeper.
Bundled with contracting in Sion, the flats are taken at 35% below market and one work order covers structure and material.
| Types | OPC 43/53, PPC, PSC, white cement, bulk cement (silo) |
|---|---|
| Brands | UltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1 |
| Lot size | 500 bags minimum; project supply 20,000 to 3,00,000 bags |
| Delivery | Truck-load to site, godown stocking near the project for daily lifting |
| Pricing basis | Brand-wise ex-depot rate + transport, monthly reset |
| Documents | Batch test certificate, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply cement to projects in Sion and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Truck-load to site, godown stocking near the project for daily lifting Smaller requirements can be clubbed with a neighbouring site in Sion if the timing works.
Batch test certificate, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
500 bags minimum; project supply 20,000 to 3,00,000 bags. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
For material-only supply in Sion the barter rate is usually 12–20% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Yes. Most developers bundle cement with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Sion:
Send the BOQ and the units you can allot. Proposal in 48 hours.