Cement supplier on barter · Taloja

Cement on barter in Taloja

Supply of cement to Taloja projects, priced at daily Mumbai rates and settled in flats or units instead of cash.

Home / Services / Cement Mumbai / Taloja
Taloja · Navi Mumbai · Navi Mumbai

Supplying Taloja

Affordable projects here want the lowest landed cost per bag; we quote brand alternatives and depot-direct pricing.

Taloja is the MIDC estate, Taloja Phase 1 and 2, the Metro line to Belapur and affordable townships filling the sectors between Kharghar and the hills.

Affordable townships of 12 to 25 floors with 1 and 2 BHKs; regular plots, Mivan construction.

Bulk cement by bulker into site silos for the batching plant and bagged cement by the truck-load for finishing; the lowest landed cost we achieve in the city is on this belt.

First-time buyers from Navi Mumbai and MIDC workers. That is who our inventory desk sells to when we take units here, which is why material-only barter in Taloja is typically 15–25% below the developer's rate rather than deeper.

Bundled with contracting in Taloja, the flats are taken at 35% below market and one work order covers structure and material.

Cement
Cement · Taloja · highway access for trailer-load deliveries
Settlement

Settlement options

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Specification

Grades, brands and lot sizes

TypesOPC 43/53, PPC, PSC, white cement, bulk cement (silo)
BrandsUltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1
Lot size500 bags minimum; project supply 20,000 to 3,00,000 bags
DeliveryTruck-load to site, godown stocking near the project for daily lifting
Pricing basisBrand-wise ex-depot rate + transport, monthly reset
DocumentsBatch test certificate, GST invoice, e-way bill
Process

How a deal runs

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Common questions about Cement in Taloja

Do you supply cement in Taloja on barter against flats?

Yes. We supply cement to projects in Taloja and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Which brands of cement do you deliver to Taloja?

500 bags minimum; project supply 20,000 to 3,00,000 bags. The brand is fixed in the MOU; substitutions only with written approval from your PMC.

Who bears the risk of the units you receive in Taloja?

We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.

What documents come with each delivery to Taloja?

Batch test certificate, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.

How soon can supply start in Taloja?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting

What if material prices move during supply to Taloja?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

Also serving

Other areas we cover

Other services in Taloja:

Searches this page answers
bulk cement supplier talojacement on barter talojacement dealer talojaopc 53 cement price talojaambuja cement dealer talojacement supplier talojacement against flats talojacement supplier navi mumbaicement dealer navi mumbaiultratech cement dealer navi mumbaicement against flats talojabarter construction talojaconstruction material supplier taloja

Need cement in Taloja without paying cash?

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞