Cement supplier on barter for Diva sites: oPC 53, PPC and PSC in bags and bulk from UltraTech, Ambuja, ACC, JK, Shree and Dalmia, settled against units in your project.
Diva is the junction station between Mumbra and Dombivli, with Agasan, Datiwali and the Diva–Shil Road belt filling with affordable launches since the Diva–Panvel line and the new bridges opened.
Affordable mid-rise projects of 10 to 22 floors with 1 and 2 BHKs on plots along Diva–Shil Road and Agasan.
Affordable projects here want the lowest landed cost per bag; we quote brand alternatives and depot-direct pricing.
Truck-load deliveries of 500 to 700 bags at night into a site godown; we top up weekly against the plaster and masonry schedule.
First-time buyers from Dombivli, Thane and the Central line suburbs. That is who our inventory desk sells to when we take units here, which is why material-only barter in Diva is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Diva, the flats are taken at 35% below market and one work order covers structure and material.
| Types | OPC 43/53, PPC, PSC, white cement, bulk cement (silo) |
|---|---|
| Brands | UltraTech, Ambuja, ACC, JK Lakshmi, Shree, Dalmia, Birla A1 |
| Lot size | 500 bags minimum; project supply 20,000 to 3,00,000 bags |
| Delivery | Truck-load to site, godown stocking near the project for daily lifting |
| Pricing basis | Brand-wise ex-depot rate + transport, monthly reset |
| Documents | Batch test certificate, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply cement to projects in Diva and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Truck-load to site, godown stocking near the project for daily lifting
For material-only supply in Diva the barter rate is usually 15–25% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Batch test certificate, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Yes. Most developers bundle cement with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Diva:
Send the BOQ and the units you can allot. Proposal in 48 hours.