AAC block supplier on barter for Diva sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Affordable projects here choose between AAC and fly-ash bricks on cost; we quote both.
Diva is the junction station between Mumbra and Dombivli, with Agasan, Datiwali and the Diva–Shil Road belt filling with affordable launches since the Diva–Panvel line and the new bridges opened.
Affordable mid-rise projects of 10 to 22 floors with 1 and 2 BHKs on plots along Diva–Shil Road and Agasan.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
First-time buyers from Dombivli, Thane and the Central line suburbs. That is who our inventory desk sells to when we take units here, which is why material-only barter in Diva is typically 15–25% below the developer's rate rather than deeper.
Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Diva for a single settlement at 35% below market.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply aac blocks & bricks to projects in Diva and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Diva if the timing works.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
Yes. Most developers bundle aac blocks & bricks with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Other services in Diva:
Send the BOQ and the units you can allot. Proposal in 48 hours.