AAC block supplier on barter · Vashi

AAC Blocks & Bricks on barter in Vashi

Supply of aac blocks & bricks to Vashi projects, priced at daily Mumbai rates and settled in flats or units instead of cash.

Home / Services / AAC Blocks & Bricks Mumbai / Vashi
Vashi · Navi Mumbai · Navi Mumbai

Vashi: aac blocks & bricks on barter

Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.

Vashi is Navi Mumbai's oldest node: Sector 17's market, the APMC, Sector 30's Inorbit belt, Palm Beach Road and hundreds of CIDCO-built 1980s buildings that are now under redevelopment.

CIDCO-society redevelopment into 12 to 22-storey buildings with 2 and 3 BHKs, and commercial towers on Palm Beach Road and Sector 30.

Trailer-load pallets crane-unloaded into a block yard; we deliver wing by wing against the masonry programme.

Families from Vashi and Sanpada who have lived in CIDCO buildings for decades and want to stay. That is who our inventory desk sells to when we take units here, which is why material-only barter in Vashi is typically 10–18% below the developer's rate rather than deeper.

Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Vashi for a single settlement at 35% below market.

AAC
AAC Blocks & Bricks · Vashi · good road access and room for a proper yard
Specification

The supply, in detail

ProductsAAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster
BrandsSiporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants
Lot size1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks
DeliveryPallet delivery with crane unloading; floor-wise scheduling
Pricing basisPer cu m or per block, brand-wise
DocumentsIS 2185 test report, GST invoice, e-way bill
Settlement

How the work order is settled

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

The process we follow

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

Common questions about AAC Blocks & Bricks in Vashi

Do you supply aac blocks & bricks in Vashi on barter against flats?

Yes. We supply aac blocks & bricks to projects in Vashi and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Is the Vashi barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

How do deliveries work at Vashi sites?

Trailer-load pallets crane-unloaded into a block yard; we deliver wing by wing against the masonry programme.

How soon can supply start in Vashi?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling

Which brands of aac blocks & bricks do you deliver to Vashi?

1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.

What if material prices move during supply to Vashi?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

Also serving

Neighbouring areas

Other services in Vashi:

Searches this page answers
aac blocks price vashisiporex dealer vashifly ash bricks supplier vashiaac blocks on barter vashiaac block dealer vashilightweight blocks vashiblock adhesive supplier vashiaac blocks supplier navi mumbaiaac block dealer navi mumbaisiporex dealer navi mumbaiaac blocks & bricks against flats vashibarter construction vashiconstruction material supplier vashi

Send the Vashi BOQ.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞